proj16.admx
proj16.Office.Microsoft.Policies.Windows · 140 policies
| Setting | Where | Registry |
|---|---|---|
| Actual costs are always calculated by Microsoft Project L_PjActualCostsCalc | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\actual costs are always calculated by microsoft office project |
| Add space before label L_PjAddSpace | User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit\spacebeforetimelabel |
| Allow cell drag and drop L_PjAllowCellDragDrop | User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\edit\drag and drop |
| Allow Trusted Locations on the network L_AllowTrustedLocationsOnTheNetwork | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\allownetworklocations |
| And move end of completed parts forward to status date L_PjAndMoveCompleted | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\andmovecompleted |
| And move start of remaining parts back to status date L_PjAndMoveRemaining | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\andmoveremaining |
| Ask to update automatic links L_PjAsktoUpdate | User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\edit\prompt for update links |
| Auto Save every L_PjSaveEvery | User > Microsoft Project 2016 > Project Options > Save > Auto Save Options | software\policies\microsoft\office\16.0\ms project\options\save\automaticsave |
| Autolink inserted or moved tasks L_PjAutolinkTasks | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\edit with auto link |
| Automatic Calculation L_PjAutoCalc | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\calculation\auto calc |
| Automatically add new items to the global project L_AutomaticallyAddNewItemsToTheGlobalProject | User > Microsoft Project 2016 > Project Options > View > Show | software\policies\microsoft\office\16.0\ms project\options\view\automatically add items to the global |
| Automatically add new resources and tasks L_PjAutoAddNew | User > Microsoft Project 2016 > Project Options > General > General options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\general\auto add resources |
| Baseline for Earned Value calculations L_PjEVBaseline | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' > Earned Value options for Project1 | software\policies\microsoft\office\16.0\ms project\options\calculation |
| Block all unmanaged add-ins L_BlockAllUnmanagedAddins | User > Microsoft Project 2016 > Miscellaneous | software\policies\microsoft\office\16.0\ms project\resiliency\restricttolist |
| Block macros from running in Office files from the internet L_BlockMacroExecutionFromInternet | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\blockcontentexecutionfrominternet |
| Calculate all open projects L_PjCalcAll | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\calculation\calcall |
| Calculate multiple critical paths L_PjCalcMultipleCriticalPaths | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\calculate multiple critical paths |
| Calendar Type L_calendartype0 | User > Microsoft Project 2016 > Project Options > View > Calendar Type | software\policies\microsoft\office\16.0\ms project\options\view |
| Configure CNG cipher chaining mode L_ConfigureCNGCipherChainingMode | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Date Format L_PjDateFormat | User > Microsoft Project 2016 > Project Options > View | software\policies\microsoft\office\16.0\ms project\options\view |
| Days L_PjDays | User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
| Days per month L_PjDaysPerMonth | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar |
| Default end time L_PjDefaultEndTime | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar |
| Default fixed costs accrual L_PjDefaultFixedAccrual | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation |
| Default overtime rate L_PjDefaultOtime | User > Microsoft Project 2016 > Project Options > General > General options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\general |
| Default Project Currency L_DefaultProjectCurrency | User > Microsoft Project 2016 > Project Options > View | software\policies\microsoft\office\16.0\ms project\options\view |
| Default standard rate L_PjDefaultStdRate | User > Microsoft Project 2016 > Project Options > General > General options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\general |
| Default start time L_PjDefaultStartTime | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar |
| Default task Earned Value method L_PjEVMethod | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' > Earned Value options for Project1 | software\policies\microsoft\office\16.0\ms project\options\calculation |
| Default task type L_PjDefaultTaskTypes | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling |
| Default View L_PjDefaultView | User > Microsoft Project 2016 > Project Options > View | software\policies\microsoft\office\16.0\ms project\options\view |
| Deletions in the Name column L_PjDeleteNameOOUI | User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for | software\policies\microsoft\office\16.0\ms project\options\interface\deletenameooui |
| Disable all application add-ins L_Disableallapplicationextensions | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\disablealladdins |
| Disable all trusted locations L_DisableTrustedLoc | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\alllocationsdisabled |
| Disable Internal ID Matching L_DisableInternalIDMatching | User > Microsoft Project 2016 > Project Options > Interface | software\policies\microsoft\office\16.0\ms project\options\interface\disable internal id matching |
| Disable the Office Start screen for Project L_DisableOfficeStartProject | User > Microsoft Project 2016 > Miscellaneous | software\policies\microsoft\office\16.0\ms project\options\general\disableboottoofficestart |
| Disable Trust Bar Notification for unsigned application add-ins and block them L_DisableTrustBarNotificationforunsigned | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\notbpromptunsignedaddin |
| Display Developer tab in the Ribbon L_DisplayDeveloperTab | User > Microsoft Project 2016 > Project Options > Customize Ribbon | software\policies\microsoft\office\16.0\ms project\settings\developertools |
| Display Project Guide L_PjGBUIDisplayToggle | User > Microsoft Project 2016 > Project Options > Interface > Project Guide settings | software\policies\microsoft\office\16.0\ms project\options\interface\gbuidisplaytoggle |
| Duration is entered in L_PjDurationUnits | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling |
| Edit directly in cell L_PjEditDirectlyCell | User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\edit\incelledit |
| Edits to start and finish dates L_PjEnterDateOOUI | User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for | software\policies\microsoft\office\16.0\ms project\options\interface\enterdateooui |
| Edits to total actual cost will be spread to the status date L_PjEditToTotalSpread | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\edits to total actual cost will be spread to the status date |
| Edits to total task % complete will be spread to the status date L_PjEditstoTotalTask | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\edits to total task %complete will be spread to the status date |
| Edits to work, units or duration L_PjChangeDurationOOUI | User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for | software\policies\microsoft\office\16.0\ms project\options\interface\changedurationooui |
| Enable untrusted intranet zone access to Project server L_EnableuntrustedintranetzoneaccesstoProjectServer | User > Microsoft Project 2016 > Project Options > Security | software\policies\microsoft\office\16.0\ms project\security\trustwss |
| Entry Bar L_PjEntryBar | User > Microsoft Project 2016 > Project Options > View > Show | software\policies\microsoft\office\16.0\ms project\options\view\show entry bar |
| Fiscal year starts in L_PjFiscalYear | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar |
| Followed hyperlink color L_PjFollowedlinkColour | User > Microsoft Project 2016 > Project Options > Edit > Hyperlink appearance in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
| Hours L_PjHours | User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
| Hours per day L_PjHoursPerDay | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar |
| Hours per week L_PjHoursPerWeek | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar |
| Hyperlink color L_PjHyperLinkColour | User > Microsoft Project 2016 > Project Options > Edit > Hyperlink appearance in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
| Inserted projects are calculated like summary tasks L_PjInsertedProjects | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\inserted projects are calculated like summary tasks |
| Keep tasks on nearest working day L_KeepTasksOnNearestWorkingDay | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\keeptaskonnearestworkingtimewhenmadeautoscheduled |
| List of managed add-ins L_ListOfManagedAddins | User > Microsoft Project 2016 > Miscellaneous | software\policies\microsoft\office\16.0\ms project\resiliency\addinlist |
| Local Project Cache Location L_CacheLocation | User > Microsoft Project 2016 > Project Options > Save > Tools | Local Project Cache | software\policies\microsoft\office\16.0\ms project\settings |
| Local Project Cache Size Limit in MB L_CacheSizePerProfile | User > Microsoft Project 2016 > Project Options > Save > Tools | Local Project Cache | software\policies\microsoft\office\16.0\ms project\settings |
| Minutes L_PjMinutes | User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
| Months L_PjMonths | User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
| Most Recently Used Template List Length L_MRUTemplateListLength | User > Microsoft Project 2016 > Miscellaneous | software\policies\microsoft\office\16.0\common\general |
| Move end of completed parts after status date back to status date L_PjMoveCompleted | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\movecompleted |
| Move selection after enter L_PjMoveAfterEnter | User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\edit\entermove |
| Move start of remaining parts before status date forward to status date L_PjMoveRemaining | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\moveremaining |
| New tasks L_PjNewTasks | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling |
| New tasks are effort driven L_PjNewTasksEffort | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\new tasks effort driven |
| New tasks have estimated durations L_PjNewTasksEstDurations | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\new tasks have estimated durations |
| Number of folders in the Recent Folders list L_SetNumberOfPlacesInTheRecentPlacesList | User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\place mru |
| Number of projects in the Recent Projects list L_PjRecentlyUsed | User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\file mru |
| OLE Link Indicators L_PjOLElinks | User > Microsoft Project 2016 > Project Options > View > Show | software\policies\microsoft\office\16.0\ms project\options\view\show ole link indicators |
| Open last file on startup L_PjOpenLast | User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\general\start with last file |
| Personal templates path for Project L_PersonalTemplatesPath | User > Microsoft Project 2016 > Miscellaneous | software\policies\microsoft\office\16.0\ms project\options\save |
| Previous-version file formats L_Legacyfileformats | User > Microsoft Project 2016 > Project Options > Security | software\policies\microsoft\office\16.0\ms project\security |
| Project Guide Content L_PjUseDefaultXMLSchema | User > Microsoft Project 2016 > Project Options > Interface > Project Guide settings for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\interface |
| Project Guide Functionality and Layout page L_PjUseDefaultStartPage | User > Microsoft Project 2016 > Project Options > Interface > Project Guide settings for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\interface |
| Project Screentips L_PjProjectScreentips | User > Microsoft Project 2016 > Project Options > View > Show | software\policies\microsoft\office\16.0\ms project\options\view\show tooltips |
| Project Summary Task L_ProjectSummaryTask | User > Microsoft Project 2016 > Project Options > View | software\policies\microsoft\office\16.0\ms project\options\view\show project summary |
| Projects L_PjFileLocProjects | User > Microsoft Project 2016 > Project Options > Save > File locations | software\policies\microsoft\office\16.0\ms project\options\save |
| Prompt before saving L_PjAutomaticSavePrompt | User > Microsoft Project 2016 > Project Options > Save > Auto Save Options | software\policies\microsoft\office\16.0\ms project\options\save\automaticsaveprompt |
| Prompt for project info for new projects L_PjPromptForInfo | User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\general\ask for summary info at new |
| Require that application add-ins are signed by Trusted Publisher L_RequirethatApplicationExtensionsaresigned | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\requireaddinsig |
| Resource Assigments L_PjResourceAssignOOUI | User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for | software\policies\microsoft\office\16.0\ms project\options\interface\resourceassignooui |
| Save Active Project only L_PjAutomaticSaveOption | User > Microsoft Project 2016 > Project Options > Save > Auto Save Options | software\policies\microsoft\office\16.0\ms project\options\save\automaticsaveoption |
| Save Interval L_PjSaveInterval | User > Microsoft Project 2016 > Project Options > Save > Auto Save Options | software\policies\microsoft\office\16.0\ms project\options\save |
| Save Microsoft Project files as L_PjFileType | User > Microsoft Project 2016 > Project Options > Save | software\policies\microsoft\office\16.0\ms project\options\save |
| Scroll Bars L_PjScrollBar | User > Microsoft Project 2016 > Project Options > View > Show | software\policies\microsoft\office\16.0\ms project\options\view\show scroll bars |
| Security Level L_PjSecurityLevel | User > Microsoft Project 2016 > Project Options > Security > Tools | Macro | software\policies\microsoft\office\16.0\ms project\security |
| Set AutoFilter on for new projects L_PjSetAutoFilter | User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\general\set autofilter on for new projects |
| Set CNG cipher algorithm L_SetCNGCipherAlgorithm | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Set CNG cipher key length L_SetCNGCipherKeyLength | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Set CNG password spin count L_SetCNGPasswordSpinCount | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Set default start date for new tasks L_SetDefaultStartDateForNewTasks | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\new tasks start on current date |
| Set new tasks to be automatically scheduled L_SetNewTasksToBeAutomaticallyScheduled | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\newtasksaremanuallyscheduled |
| Set parameters for CNG context L_SetParametersForCNGContext | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Show assignment units as L_PjAssignmentUnits | User > Microsoft Project 2016 > Project Options > Schedule > Schedule options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\scheduling |
| Show custom templates tab by default in Project on the Office Start screen and in File | New L_DefaultCustomTab | User > Microsoft Project 2016 > Miscellaneous | software\policies\microsoft\office\16.0\ms project\options\general\officestartdefaulttab |
| Show scheduling messages L_PjShowSchedMessage | User > Microsoft Project 2016 > Project Options > Schedule > Schedule options for Microsoft Project | software\policies\microsoft\office\16.0\ms project\options\scheduling\schedule messages |
| Show tasks schedule suggestions L_ShowTasksScheduleSuggestions | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\showtasksuggestions |
| Show tasks schedule warnings L_ShowTasksScheduleWarnings | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\showtaskwarnings |
| Show that tasks have estimated durations L_PjShowEstimatedDurations | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\show estimated durations |
| Specify CNG hash algorithm L_SpecifyCNGHashAlgorithm | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Specify CNG random number generator algorithm L_SpecifyCNGRandomNumberGeneratorAlgorithm | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Specify CNG salt length L_SpecifyCNGSaltLength | User > Microsoft Project 2016 > Project Options > Security > Cryptography | software\policies\microsoft\office\16.0\ms project\security\crypto |
| Split in-progress tasks L_PjSplitinProgressTasks | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\auto split tasks |
| Status Bar L_PjStatusBar | User > Microsoft Project 2016 > Project Options > View > Show | software\policies\microsoft\office\16.0\ms project\options\view\show status bar |
| Tasks are critical if slack is less than or equal to L_PjCritIfLess | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation |
| Tasks can be made inactive L_TasksCanBeMadeInactive | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\canmakeinactivetasks |
| Tasks will always honor their constraint dates L_PjTasksHonorConstraints | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\honorconstraints |
| Trusted Location #1 L_TrustedLoc01 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location1 |
| Trusted Location #10 L_TrustedLoc10 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location10 |
| Trusted Location #11 L_TrustedLoc11 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location11 |
| Trusted Location #12 L_TrustedLoc12 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location12 |
| Trusted Location #13 L_TrustedLoc13 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location13 |
| Trusted Location #14 L_TrustedLoc14 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location14 |
| Trusted Location #15 L_TrustedLoc15 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location15 |
| Trusted Location #16 L_TrustedLoc16 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location16 |
| Trusted Location #17 L_TrustedLoc17 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location17 |
| Trusted Location #18 L_TrustedLoc18 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location18 |
| Trusted Location #19 L_TrustedLoc19 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location19 |
| Trusted Location #2 L_TrustedLoc02 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location2 |
| Trusted Location #20 L_TrustedLoc20 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location20 |
| Trusted Location #3 L_TrustedLoc03 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location3 |
| Trusted Location #4 L_TrustedLoc04 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location4 |
| Trusted Location #5 L_TrustedLoc05 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location5 |
| Trusted Location #6 L_TrustedLoc06 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location6 |
| Trusted Location #7 L_TrustedLoc07 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location7 |
| Trusted Location #8 L_TrustedLoc08 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location8 |
| Trusted Location #9 L_TrustedLoc09 | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security\trusted locations\location9 |
| Underline hyperlinks L_PjUnderlineLinks | User > Microsoft Project 2016 > Project Options > Edit > Hyperlink appearance in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit\webunderlinehyperlinks |
| Undo Levels L_UndoLevels | User > Microsoft Project 2016 > Project Options > General | software\policies\microsoft\office\16.0\ms project\options\general |
| Update manually scheduled tasks when editing links L_UpdateManuallyScheduledTasksWhenEditingLinks | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling\updatemanuallyscheduledtaskswheneditinglinks |
| Updating task status updates resource status L_PjUpdatingTask | User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\calculation\auto track resources |
| Use starting year for FY numbering L_PjStartingYear | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar\use starting year for fy numbering |
| User Templates L_PjFileLocUserTemplates | User > Microsoft Project 2016 > Project Options > Save > File locations | software\policies\microsoft\office\16.0\ms project\options\save |
| VBA Macro Notification Settings L_VBAWarningsPolicy | User > Microsoft Project 2016 > Project Options > Security > Trust Center | software\policies\microsoft\office\16.0\ms project\security |
| Week starts on L_PjWeekStarts | User > Microsoft Project 2016 > Project Options > Calendar | software\policies\microsoft\office\16.0\ms project\options\calendar |
| Weeks L_PjWeeks | User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
| Windows in Taskbar L_PjWindowsinStatusBar | User > Microsoft Project 2016 > Project Options > View > Show | software\policies\microsoft\office\16.0\ms project\options\view\show windows in taskbar |
| Work is entered in L_PjWorkUnits | User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' | software\policies\microsoft\office\16.0\ms project\options\scheduling |
| Years L_PjYears | User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' | software\policies\microsoft\office\16.0\ms project\options\edit |
Source: Administrative Template files for Microsoft 365 Apps for enterprise, Office LTSC 2021/2024 and Office 2016, version 5568.1000 (2026-08-10).
ADMX Viewer is open source: github.com/deadarcher/AdmxViewer. Found a wrong registry value, a missing catalog, or a template that won't load? Open an issue, email brian@getrff.com, or use the form below.
Your note and the summary below are all that get sent. Your file stays on your machine.