proj16.Office.Microsoft.Policies.Windows · 140 policies

SettingWhereRegistry
Actual costs are always calculated by Microsoft Project
L_PjActualCostsCalc
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\actual costs are always calculated by microsoft office project
Add space before label
L_PjAddSpace
User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit\spacebeforetimelabel
Allow cell drag and drop
L_PjAllowCellDragDrop
User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\edit\drag and drop
Allow Trusted Locations on the network
L_AllowTrustedLocationsOnTheNetwork
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\allownetworklocations
And move end of completed parts forward to status date
L_PjAndMoveCompleted
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\andmovecompleted
And move start of remaining parts back to status date
L_PjAndMoveRemaining
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\andmoveremaining
Ask to update automatic links
L_PjAsktoUpdate
User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\edit\prompt for update links
Auto Save every
L_PjSaveEvery
User > Microsoft Project 2016 > Project Options > Save > Auto Save Options software\policies\microsoft\office\16.0\ms project\options\save\automaticsave
Autolink inserted or moved tasks
L_PjAutolinkTasks
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\edit with auto link
Automatic Calculation
L_PjAutoCalc
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\calculation\auto calc
Automatically add new items to the global project
L_AutomaticallyAddNewItemsToTheGlobalProject
User > Microsoft Project 2016 > Project Options > View > Show software\policies\microsoft\office\16.0\ms project\options\view\automatically add items to the global
Automatically add new resources and tasks
L_PjAutoAddNew
User > Microsoft Project 2016 > Project Options > General > General options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\general\auto add resources
Baseline for Earned Value calculations
L_PjEVBaseline
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' > Earned Value options for Project1 software\policies\microsoft\office\16.0\ms project\options\calculation
Block all unmanaged add-ins
L_BlockAllUnmanagedAddins
User > Microsoft Project 2016 > Miscellaneous software\policies\microsoft\office\16.0\ms project\resiliency\restricttolist
Block macros from running in Office files from the internet
L_BlockMacroExecutionFromInternet
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\blockcontentexecutionfrominternet
Calculate all open projects
L_PjCalcAll
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\calculation\calcall
Calculate multiple critical paths
L_PjCalcMultipleCriticalPaths
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\calculate multiple critical paths
Calendar Type
L_calendartype0
User > Microsoft Project 2016 > Project Options > View > Calendar Type software\policies\microsoft\office\16.0\ms project\options\view
Configure CNG cipher chaining mode
L_ConfigureCNGCipherChainingMode
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Date Format
L_PjDateFormat
User > Microsoft Project 2016 > Project Options > View software\policies\microsoft\office\16.0\ms project\options\view
Days
L_PjDays
User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit
Days per month
L_PjDaysPerMonth
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar
Default end time
L_PjDefaultEndTime
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar
Default fixed costs accrual
L_PjDefaultFixedAccrual
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation
Default overtime rate
L_PjDefaultOtime
User > Microsoft Project 2016 > Project Options > General > General options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\general
Default Project Currency
L_DefaultProjectCurrency
User > Microsoft Project 2016 > Project Options > View software\policies\microsoft\office\16.0\ms project\options\view
Default standard rate
L_PjDefaultStdRate
User > Microsoft Project 2016 > Project Options > General > General options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\general
Default start time
L_PjDefaultStartTime
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar
Default task Earned Value method
L_PjEVMethod
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' > Earned Value options for Project1 software\policies\microsoft\office\16.0\ms project\options\calculation
Default task type
L_PjDefaultTaskTypes
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling
Default View
L_PjDefaultView
User > Microsoft Project 2016 > Project Options > View software\policies\microsoft\office\16.0\ms project\options\view
Deletions in the Name column
L_PjDeleteNameOOUI
User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for software\policies\microsoft\office\16.0\ms project\options\interface\deletenameooui
Disable all application add-ins
L_Disableallapplicationextensions
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\disablealladdins
Disable all trusted locations
L_DisableTrustedLoc
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\alllocationsdisabled
Disable Internal ID Matching
L_DisableInternalIDMatching
User > Microsoft Project 2016 > Project Options > Interface software\policies\microsoft\office\16.0\ms project\options\interface\disable internal id matching
Disable the Office Start screen for Project
L_DisableOfficeStartProject
User > Microsoft Project 2016 > Miscellaneous software\policies\microsoft\office\16.0\ms project\options\general\disableboottoofficestart
Disable Trust Bar Notification for unsigned application add-ins and block them
L_DisableTrustBarNotificationforunsigned
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\notbpromptunsignedaddin
Display Developer tab in the Ribbon
L_DisplayDeveloperTab
User > Microsoft Project 2016 > Project Options > Customize Ribbon software\policies\microsoft\office\16.0\ms project\settings\developertools
Display Project Guide
L_PjGBUIDisplayToggle
User > Microsoft Project 2016 > Project Options > Interface > Project Guide settings software\policies\microsoft\office\16.0\ms project\options\interface\gbuidisplaytoggle
Duration is entered in
L_PjDurationUnits
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling
Edit directly in cell
L_PjEditDirectlyCell
User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\edit\incelledit
Edits to start and finish dates
L_PjEnterDateOOUI
User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for software\policies\microsoft\office\16.0\ms project\options\interface\enterdateooui
Edits to total actual cost will be spread to the status date
L_PjEditToTotalSpread
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\edits to total actual cost will be spread to the status date
Edits to total task % complete will be spread to the status date
L_PjEditstoTotalTask
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\edits to total task %complete will be spread to the status date
Edits to work, units or duration
L_PjChangeDurationOOUI
User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for software\policies\microsoft\office\16.0\ms project\options\interface\changedurationooui
Enable untrusted intranet zone access to Project server
L_EnableuntrustedintranetzoneaccesstoProjectServer
User > Microsoft Project 2016 > Project Options > Security software\policies\microsoft\office\16.0\ms project\security\trustwss
Entry Bar
L_PjEntryBar
User > Microsoft Project 2016 > Project Options > View > Show software\policies\microsoft\office\16.0\ms project\options\view\show entry bar
Fiscal year starts in
L_PjFiscalYear
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar
Followed hyperlink color
L_PjFollowedlinkColour
User > Microsoft Project 2016 > Project Options > Edit > Hyperlink appearance in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit
Hours
L_PjHours
User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit
Hours per day
L_PjHoursPerDay
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar
Hours per week
L_PjHoursPerWeek
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar
Hyperlink color
L_PjHyperLinkColour
User > Microsoft Project 2016 > Project Options > Edit > Hyperlink appearance in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit
Inserted projects are calculated like summary tasks
L_PjInsertedProjects
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\inserted projects are calculated like summary tasks
Keep tasks on nearest working day
L_KeepTasksOnNearestWorkingDay
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\keeptaskonnearestworkingtimewhenmadeautoscheduled
List of managed add-ins
L_ListOfManagedAddins
User > Microsoft Project 2016 > Miscellaneous software\policies\microsoft\office\16.0\ms project\resiliency\addinlist
Local Project Cache Location
L_CacheLocation
User > Microsoft Project 2016 > Project Options > Save > Tools | Local Project Cache software\policies\microsoft\office\16.0\ms project\settings
Local Project Cache Size Limit in MB
L_CacheSizePerProfile
User > Microsoft Project 2016 > Project Options > Save > Tools | Local Project Cache software\policies\microsoft\office\16.0\ms project\settings
Minutes
L_PjMinutes
User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit
Months
L_PjMonths
User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit
Most Recently Used Template List Length
L_MRUTemplateListLength
User > Microsoft Project 2016 > Miscellaneous software\policies\microsoft\office\16.0\common\general
Move end of completed parts after status date back to status date
L_PjMoveCompleted
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\movecompleted
Move selection after enter
L_PjMoveAfterEnter
User > Microsoft Project 2016 > Project Options > Edit > Edit options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\edit\entermove
Move start of remaining parts before status date forward to status date
L_PjMoveRemaining
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\moveremaining
New tasks
L_PjNewTasks
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling
New tasks are effort driven
L_PjNewTasksEffort
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\new tasks effort driven
New tasks have estimated durations
L_PjNewTasksEstDurations
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\new tasks have estimated durations
Number of folders in the Recent Folders list
L_SetNumberOfPlacesInTheRecentPlacesList
User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project software\policies\microsoft\office\16.0\ms project\place mru
Number of projects in the Recent Projects list
L_PjRecentlyUsed
User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project software\policies\microsoft\office\16.0\ms project\file mru
OLE Link Indicators
L_PjOLElinks
User > Microsoft Project 2016 > Project Options > View > Show software\policies\microsoft\office\16.0\ms project\options\view\show ole link indicators
Open last file on startup
L_PjOpenLast
User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\general\start with last file
Personal templates path for Project
L_PersonalTemplatesPath
User > Microsoft Project 2016 > Miscellaneous software\policies\microsoft\office\16.0\ms project\options\save
Previous-version file formats
L_Legacyfileformats
User > Microsoft Project 2016 > Project Options > Security software\policies\microsoft\office\16.0\ms project\security
Project Guide Content
L_PjUseDefaultXMLSchema
User > Microsoft Project 2016 > Project Options > Interface > Project Guide settings for 'Project1' software\policies\microsoft\office\16.0\ms project\options\interface
Project Guide Functionality and Layout page
L_PjUseDefaultStartPage
User > Microsoft Project 2016 > Project Options > Interface > Project Guide settings for 'Project1' software\policies\microsoft\office\16.0\ms project\options\interface
Project Screentips
L_PjProjectScreentips
User > Microsoft Project 2016 > Project Options > View > Show software\policies\microsoft\office\16.0\ms project\options\view\show tooltips
Project Summary Task
L_ProjectSummaryTask
User > Microsoft Project 2016 > Project Options > View software\policies\microsoft\office\16.0\ms project\options\view\show project summary
Projects
L_PjFileLocProjects
User > Microsoft Project 2016 > Project Options > Save > File locations software\policies\microsoft\office\16.0\ms project\options\save
Prompt before saving
L_PjAutomaticSavePrompt
User > Microsoft Project 2016 > Project Options > Save > Auto Save Options software\policies\microsoft\office\16.0\ms project\options\save\automaticsaveprompt
Prompt for project info for new projects
L_PjPromptForInfo
User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\general\ask for summary info at new
Require that application add-ins are signed by Trusted Publisher
L_RequirethatApplicationExtensionsaresigned
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\requireaddinsig
Resource Assigments
L_PjResourceAssignOOUI
User > Microsoft Project 2016 > Project Options > Interface > Show indicators and Option butons for software\policies\microsoft\office\16.0\ms project\options\interface\resourceassignooui
Save Active Project only
L_PjAutomaticSaveOption
User > Microsoft Project 2016 > Project Options > Save > Auto Save Options software\policies\microsoft\office\16.0\ms project\options\save\automaticsaveoption
Save Interval
L_PjSaveInterval
User > Microsoft Project 2016 > Project Options > Save > Auto Save Options software\policies\microsoft\office\16.0\ms project\options\save
Save Microsoft Project files as
L_PjFileType
User > Microsoft Project 2016 > Project Options > Save software\policies\microsoft\office\16.0\ms project\options\save
Scroll Bars
L_PjScrollBar
User > Microsoft Project 2016 > Project Options > View > Show software\policies\microsoft\office\16.0\ms project\options\view\show scroll bars
Security Level
L_PjSecurityLevel
User > Microsoft Project 2016 > Project Options > Security > Tools | Macro software\policies\microsoft\office\16.0\ms project\security
Set AutoFilter on for new projects
L_PjSetAutoFilter
User > Microsoft Project 2016 > Project Options > General > General options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\general\set autofilter on for new projects
Set CNG cipher algorithm
L_SetCNGCipherAlgorithm
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Set CNG cipher key length
L_SetCNGCipherKeyLength
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Set CNG password spin count
L_SetCNGPasswordSpinCount
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Set default start date for new tasks
L_SetDefaultStartDateForNewTasks
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\new tasks start on current date
Set new tasks to be automatically scheduled
L_SetNewTasksToBeAutomaticallyScheduled
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\newtasksaremanuallyscheduled
Set parameters for CNG context
L_SetParametersForCNGContext
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Show assignment units as
L_PjAssignmentUnits
User > Microsoft Project 2016 > Project Options > Schedule > Schedule options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\scheduling
Show custom templates tab by default in Project on the Office Start screen and in File | New
L_DefaultCustomTab
User > Microsoft Project 2016 > Miscellaneous software\policies\microsoft\office\16.0\ms project\options\general\officestartdefaulttab
Show scheduling messages
L_PjShowSchedMessage
User > Microsoft Project 2016 > Project Options > Schedule > Schedule options for Microsoft Project software\policies\microsoft\office\16.0\ms project\options\scheduling\schedule messages
Show tasks schedule suggestions
L_ShowTasksScheduleSuggestions
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\showtasksuggestions
Show tasks schedule warnings
L_ShowTasksScheduleWarnings
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\showtaskwarnings
Show that tasks have estimated durations
L_PjShowEstimatedDurations
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\show estimated durations
Specify CNG hash algorithm
L_SpecifyCNGHashAlgorithm
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Specify CNG random number generator algorithm
L_SpecifyCNGRandomNumberGeneratorAlgorithm
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Specify CNG salt length
L_SpecifyCNGSaltLength
User > Microsoft Project 2016 > Project Options > Security > Cryptography software\policies\microsoft\office\16.0\ms project\security\crypto
Split in-progress tasks
L_PjSplitinProgressTasks
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\auto split tasks
Status Bar
L_PjStatusBar
User > Microsoft Project 2016 > Project Options > View > Show software\policies\microsoft\office\16.0\ms project\options\view\show status bar
Tasks are critical if slack is less than or equal to
L_PjCritIfLess
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation
Tasks can be made inactive
L_TasksCanBeMadeInactive
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\canmakeinactivetasks
Tasks will always honor their constraint dates
L_PjTasksHonorConstraints
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\honorconstraints
Trusted Location #1
L_TrustedLoc01
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location1
Trusted Location #10
L_TrustedLoc10
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location10
Trusted Location #11
L_TrustedLoc11
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location11
Trusted Location #12
L_TrustedLoc12
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location12
Trusted Location #13
L_TrustedLoc13
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location13
Trusted Location #14
L_TrustedLoc14
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location14
Trusted Location #15
L_TrustedLoc15
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location15
Trusted Location #16
L_TrustedLoc16
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location16
Trusted Location #17
L_TrustedLoc17
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location17
Trusted Location #18
L_TrustedLoc18
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location18
Trusted Location #19
L_TrustedLoc19
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location19
Trusted Location #2
L_TrustedLoc02
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location2
Trusted Location #20
L_TrustedLoc20
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location20
Trusted Location #3
L_TrustedLoc03
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location3
Trusted Location #4
L_TrustedLoc04
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location4
Trusted Location #5
L_TrustedLoc05
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location5
Trusted Location #6
L_TrustedLoc06
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location6
Trusted Location #7
L_TrustedLoc07
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location7
Trusted Location #8
L_TrustedLoc08
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location8
Trusted Location #9
L_TrustedLoc09
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security\trusted locations\location9
Underline hyperlinks
L_PjUnderlineLinks
User > Microsoft Project 2016 > Project Options > Edit > Hyperlink appearance in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit\webunderlinehyperlinks
Undo Levels
L_UndoLevels
User > Microsoft Project 2016 > Project Options > General software\policies\microsoft\office\16.0\ms project\options\general
Update manually scheduled tasks when editing links
L_UpdateManuallyScheduledTasksWhenEditingLinks
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling\updatemanuallyscheduledtaskswheneditinglinks
Updating task status updates resource status
L_PjUpdatingTask
User > Microsoft Project 2016 > Project Options > Calculation > Calculation options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\calculation\auto track resources
Use starting year for FY numbering
L_PjStartingYear
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar\use starting year for fy numbering
User Templates
L_PjFileLocUserTemplates
User > Microsoft Project 2016 > Project Options > Save > File locations software\policies\microsoft\office\16.0\ms project\options\save
VBA Macro Notification Settings
L_VBAWarningsPolicy
User > Microsoft Project 2016 > Project Options > Security > Trust Center software\policies\microsoft\office\16.0\ms project\security
Week starts on
L_PjWeekStarts
User > Microsoft Project 2016 > Project Options > Calendar software\policies\microsoft\office\16.0\ms project\options\calendar
Weeks
L_PjWeeks
User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit
Windows in Taskbar
L_PjWindowsinStatusBar
User > Microsoft Project 2016 > Project Options > View > Show software\policies\microsoft\office\16.0\ms project\options\view\show windows in taskbar
Work is entered in
L_PjWorkUnits
User > Microsoft Project 2016 > Project Options > Schedule > Scheduling options for 'Project1' software\policies\microsoft\office\16.0\ms project\options\scheduling
Years
L_PjYears
User > Microsoft Project 2016 > Project Options > Edit > View options for time units in 'Project1' software\policies\microsoft\office\16.0\ms project\options\edit